Mud Transported From Connecting Channel on Jl. Swasembada
access_time March 06 2017 04:37 PM remove_red_eye 1658
Reported by TP Moan Simanjuntak | Translated by Nugroho Adibrata
Reported by TP Moan Simanjuntak | Translated by Nugroho Adibrata
A connecting channel (PHB) on Jalan Swasembada, Kebon Bawang Urban Village, Tanjung Priok, North Jakarta is dredged. It aims to accommodate mud in large quantities when rain pours.
It has been done since last week. We predict it will take 25 days
North Jakarta Water Resources Sub-dept. Head, Herning Wahyuningsih said, dredging is carried out from next to office of Kebon Bawang Urban Village until bridge as long as 220 meters with five meters width and one meter depth.
"The channel is full of mud. Moreover rain continues to pour the capital. Hence, we dredge the channel up to one-one half meters depth," she expressed, Monday (3/6).
Connecting Channel on Jl. TK Pembina DredgedTo speed up it, one excavator and two trucks are sent to the location.
"It has been done since last week. We predict it will take 25 days," he closed.